|
Selma Storm Drain Projects Civil Engineer: Gateway Engineering, Inc.
This project created additional storage and includes a pump sump structure to convert the basin to a peaking pond in a future phase of construction. The next phase of construction is scheduled for this summer and will include approximately $1.4 million in storm drain system improvements, separating the City from two points of discharge to CID and greatly enhancing drainage in the northwest part of the City. |
|
| Copyright 2011 © Gateway Engineering, Inc. |